ÆVIFEX
Rendered design study of Vessel 001Rendered design study · not a production photograph
← InstrumentsPublic dossier · V-001 · revision A

VESSEL 001

A 750 ml double-wall titanium vessel organized around a quarter-turn crown, replaceable seal cartridge, removable service sleeve, and serialized base module.

Current statusDESIGN STUDY · ENGINEERING VALIDATION PENDING
Capacity
750 ml target
Body
Double-wall titanium target
Closure
Quarter-turn crown study
Target price
$185 · unverified
Spatial study · V-001/XRStudio reflections / camera + scroll
Service architecture · interactive test

FORM, OPENED.

Move for depth. Scroll to orbit and separate the four service layers.

01 / Crown

Quarter-turn control

A broad, glove-readable closure with a positive index and no hidden electronics.

02 / Seal

Replaceable cartridge

The primary wear part lifts clear of the structural neck without adhesive or specialist tools.

03 / Sleeve

Sacrificial grip layer

A removable impact surface takes the scars while the titanium vacuum body remains in service.

04 / Base

Serialized service module

Identity, configuration, and a first spare seal stay physically attached to the instrument.

Part by part

THE SERVICE PATH IS PART OF THE FORM.

These begin as design intentions. Each part remains conditional until its prototype record survives the relevant gate; the current public state is shown below.

01 / Crown

Quarter-turn closure

A large, glove-readable control with a visible sealed index. Geometry and cycle life remain to be proven.

02 / Seal

Drop-in cartridge

The primary wear component is intended to leave the structural cap untouched and replace without adhesives.

03 / Sleeve

Service surface

A removable grip and impact layer intended to take wear without condemning the vacuum body beneath it.

04 / Base

Serial module

A record plate and spare-seal location intended to keep configuration and first service parts with the object.

Validation ledger

NO PREORDER BEFORE THESE SIX GATES.

Pending means no claim is being made yet. Results, failures, changes, and supplier decisions belong here before money changes hands.

01

Crown cycle

Quarter-turn geometry, glove use, grit ingress, and repeated open-close wear.

Pending
02

Seal validation

Leak, heat, cold, taste, cleaning chemistry, and cartridge replacement without special tools.

Pending
03

Drop programme

Base, shoulder, crown, and oblique impact with dent and vacuum-loss inspection.

Pending
04

Thermal record

Hot and cold retention measured against a published test method, not a marketing adjective.

Pending
05

Supplier proof

Material certificates, tolerance capability, part continuity, and landed cost.

Pending
06

Pilot owners

A controlled first group with serialized configuration and a documented service route.

Locked
Interest, not preorder

FOLLOW VESSEL 001 THROUGH VALIDATION.

Registering records demand. It does not reserve a serial, lock a price, or take payment.

No payment, serial reservation, promised price, or delivery date. Privacy.